The Lahore Electric Supply Company (Lesco) has provided critical information for installing net metering or solar meters in the locations it serves. According to a Lesco spokesperson, installing a net meter is simple and straightforward. Lesco has made it clear that any private firm demanding additional fees throughout this process is unrelated to the corporation.
Charge Type | Residential Cost (per kW) | Commercial Cost (per kW) |
Name Change or Load Increase | Rs. 1,220 | Rs. 1,810 |
NOC Submission Locations | SDO, XEN, SE, Chief Engineer | Based on power capacity |
Contents
No Hidden Costs of Corruption in the Process
Lesco’s role in the net meter installation procedure is limited to providing the No Objection Certificate (NOC) for net meters, which customers can purchase from any approved company. The company’s representative has emphasized that there will be no bribery during the installation process, and customers should report any such request to higher authorities.

Related Also: LESCO Bill Online Check by Serial Number in 2024
Standard Fees for Installation and Other Services
Standard Charges Overview:
- Residential Name Change or Load Increase: Rs. 1,220 per kW
- Commercial Name Change or Load Increase: Rs. 1,810 per kW
- NOC Issuance: Handled by Lesco for approved companies
- No Extra Fees: Beyond the standard charges
Where to Submit NOC Applications
The representative provided information on where to file NOC applications based on the required electrical capacity. Consumers should submit requests for up to 15 kilowatts to the Sub-Divisional Officer.
Applications for NOCs up to 70 kilowatts should be submitted to the Executive Engineer (XEN). If the proposed power capacity falls between 70 and 500 kilowatts, applications must be submitted to the Superintending Engineer (SE). Finally, applications for NOCs of 500 kilowatts to 1 megawatt should be submitted to the Chief Engineer Planning Office.
Lesco’s Role in the Net Metering Process
Lesco’s primary function in the net metering procedure is to provide the necessary NOC. Once this certificate is obtained, customers can purchase and install net meters from any certified company. Lesco does not sell these meters and does not charge any additional fees above the standard installation and service charges. This ensures that the process is simple, transparent, and without corruption.

Related Also: How to Download Your LESCO Bill in PDF 2024
Conclusion
Lesco has said that the process of installing net meters is designed to be simple and transparent, with no room for corruption. The provider just charges a set amount for installation, name changes, and load increases.
Customers are encouraged to report any illegal activities throughout the installation process. Consumers can avoid being overcharged and have a smooth installation by understanding the process and fees involved.
FAQs
What is the role of Lesco in the net metering process?
Lesco’s role is to issue the No Objection Certificate (NOC) for net meters, allowing consumers to purchase and install these meters from any approved company.
Are there any hidden fees for installing a net meter?
No, Lesco does not impose any hidden fees. The only charges are for installation, changing the account name, or increasing load capacity.
Where should I submit my NOC application?
The NOC application should be submitted to the appropriate office based on the power capacity: SDO for up to 15 kW, XEN for up to 70 kW, SE for 70 kW to 500 kW, and the Chief Engineer Planning office for 500 kW to 1 MW.
What should I do if a Lesco official asks for a bribe?
If a Lesco official demands a bribe, report the incident to higher authorities immediately to ensure the process remains corruption-free.