How to Get a New LESCO Connection 2025 (Complete Guide)

If you require a new LESCO energy connection or wish to change the name, load, or rate on an existing connection, the process is simpler than you would expect. You can apply online via a centralized web system called ENC, which is used across Pakistan.

This implies you don’t have to go to the office in person. Go to the website, pick “Apply,” and fill out the form with your information. You’ll need to choose your firm (LESCO), subdivision, and other details such as your name, CNIC, and address. After you’ve completed the form, you can submit it online. Following submission, you will be given a tracking ID that allows you to track the status of your application.

New LESCO Connection
New LESCO Connection

LESCO ConnectionDetails
Visit ENC websitehttps://enc.com.pk/
Select “ApplyChoose options like company and subdivision
Fill out the formProvide details such as name, CNIC, address
Submit onlineReceive a tracking ID for monitoring

Documents Required for a New Connection 2025

When applying for a new LESCO connection, you must upload specific documentation. These include a copy of the property document (such as Fard or Registry), an attested copy of your CNIC, a CNIC copy of a witness, and a copy of your neighbor’s LESCO bill.

You’ll also need a test report from a qualified wiring contractor. Before submitting any files, make sure they are less than 300kb in size. You can submit your application after uploading all necessary documents and agreeing to the terms and conditions. Following submission, your application will be processed, and you can track its progress using the tracking ID supplied.

Important Documents Needed:

  • Property document (Fard, Registry, etc.)
  • Attested CNIC copy of the applicant and witness
  • Neighbor’s LESCO bill copy
  • Wiring contractor’s test report

How to Print and Submit Your Application

LESCO will check your information after your application is submitted. A WAPDA officer may visit your location to verify the information you supplied. Once everything has been verified, you can print your Demand Notice (DN) from the ENC website.

You’ll need your tracking ID to complete this. After printing the DN, pay the charge at any specified bank. The paid DN can then be uploaded to the ENC website or sent directly to the LESCO office. This completes your application, and LESCO will begin the process of installing your new connection.

Steps to Print and Submit:

  • Visit the ENC website to print DN
  • Pay the DN at a bank
  • Upload the paid DN online
  • Submit it to the LESCO office

Tracking Your New Connection Application

If you wish to know the status of your LESCO connection application, you may quickly check it online. Visit the ENC website and click the “Track” button. You’ll need to provide your tracking ID and choose a type of application, such as a new connection. After you’ve entered these facts, click submit to see the status of your application. This allows you to stay informed about the status of your application without needing to visit the LESCO office.

Benefits of Tracking Online:

  • Stay updated on your application status
  • Avoid unnecessary trips to the office
  • Easy and convenient process
  • Immediate results online

Installation and Time Frame for New Connection

Once your Demand Notice has been paid and verified, LESCO will approve your connection and install a new meter at the stated location. The time it takes to get your new connection varies according to the load category. For example, if your load is up to 15kW, it falls into Category 1, and the entire process typically takes 30 days.

The larger the load, the longer the process may take; Category 3 (71kW-500kW) can take up to 73 days. The specific stages and time necessary for each category vary, but LESCO will handle all technical work to guarantee your connection is properly set up.

Connection Time Frames:

  • Category 1 (1kW-15kW): ~30 days
  • Category 2 (16kW-70kW): ~53 days
  • Category 3 (71kW-500kW): ~73 days

Changing Connection Name, Load, or Tariff

If you need to change the name of your connection, load, or tariff plan, you can do it online. Go to the ENC website and pick “Change” from the menu. Fill out the application with the required information, such as your reference number, CNIC, and cellphone number.

If you want to change the name, enter both the old and new names. Fill out the required fields if you want to change your load or pricing. Attach any relevant documents, such as a copy of your CNIC and proof of ownership, and then submit your application. You can also print and submit your Demand Notice, just as you would with a new connection application.

Steps to Change Connection Details:

  • Visit ENC website and select “Change”
  • Enter the details like reference number and CNIC
  • Attach the necessary documents
  • Submit and print the Demand Notice

Conclusion

With the ENC web portal, you may easily get a new LESCO connection or change the details of your existing one. Following the processes mentioned above allows you to simply apply, track, and complete your connection process without having to visit the office many times. LESCO has made it easy to control your electricity connection from the comfort of your own home.

FAQs

What is the process for getting a new electricity connection in Lahore?

You can apply online through the ENC website by filling out the necessary forms and submitting the required documents.

How do I check the status of my LESCO connection application?

Is it necessary to submit a hard copy to the LESCO office?

Which bank should I use to pay the Demand Notice?